Latest Article Get our latest posts by subscribing this site

PROJECT LIST

1
PT. RUHAAK PHALA INDUSTRY (LTD) – Tangerang

-     Fabrikasi Stop log & Bar screen; period: November 2007

      Client : Bendungan Curug - Karawang

-     Fabrikasi Coal Dump truck; period: Desember 2007

      Client : PT. Sentra Sarana Baja (SSB) Transportation

-     Fabrikasi Truck Tank; Period: January 2008

      Client : PT. Sentra Sarana Baja (SSB) Transportation
2
 PT. BOUSTEAD MAXITHERM INDUSTRY – Bekasi

-     Fit up & Welding Indirect heater (PV.028); December 2007

      Client : PT. MEDCO
3
PT. GAPURA TEKINDO SAKTI – Bekasi

-     Engineering Modification MFO Boiler to Coal Boiler cap. 3 tons/hr; 
      December 2007

      Client : PT. VONEX INDONESIA - Bandung

-     Fabrication & Installation Modify MFO Boiler to Coal Boiler cap. 3 tons/hr;       
      December 2007

      Client : PT. VONEX INDONESIA – Bandung
4
PT. BINTANG LESTARI PERSADA

-    Installation Steam Piping; December 2007

      Client : PT. SAMPOERNA - Karawang

-    Installation RO Piping; December 2007 Client : PT. GRAHADIKA – Jakarta

5
PT. ZUG INDUSTRY

-     Re-tube Furnace tube Hamada Boiler type DF 16-16 FBC; Period: March 2008

      Client : PT. KITM INDONESIA TEXTILE MILLS – Cikampek

-     Supply Induced Draft Fan Impeller Hamada Boiler type DF 16-16 FBC; 
      Period: April 2008  Client : PT. KITM INDONESIA TEXTILE MILLS – Cikampek

     
6
CV. TRIE FASHION

-     Fabrication & Installation Modify Solar Boiler to Coal Boiler (Vertical Type) 
      cap. 1 tons/hr; May 2008 Client : CV. TRIE FASHION – Tangerang

      
7
CV. MITRA AGRO LESTARI

-     Supply Heat exchanger for drying coconut char coal; October 2008

      Client : CV. Mitra Agro Lestari  – Jakarta
8
 PT. PURNAMA TIRTATEX

-     Re-tube Furnace tube Hamada Boiler type DF 12-12 FBC; Period: January 2008

       Client : PT. PURNAMA TIRTATEX  – Bandung.

-     Engineering, Design & Installation Thermal Oil Heater  6.000.000 kcal/jam; 
       type:QXL-600-FBC Period: March 2010

-     Engineering, Design & Installation Steam Boiler kapasitas 12 ton/jam; 
      type: DF12-12-FBC Period: 2011 – 2012
9
 PT. ENGGAL SUBUR KERTAS

-    Modify Chain grate Boiler to Fluidized Bed Combustion type DZL 20; 
      Period: July 2009 Client : PT. ENGGAL SUBUR KERTAS – Kudus – Jateng

       

-     Re-tube Furnace tube Hamada Boiler type DF 12-12 FBC; Period: September 2009
10
PT. BUANA SURYA TEKNINDO

-     Re-tube Furnace tube Hamada Boiler type DF 16-16 FBC; Period: January 2010

      Client : PT. LAUTAN OTSUKA CHEMICAL  – Cilegon – Banten

-     Engineering, Design, & Installation of Fluidized Bed Combustion Boiler kapasitas 
      15 ton/jam type DF 15-16 FBC; Period: 2010 – 2011

         Client : PT. Indah Kiat  – Serpong  – Tangerang Selatan – Banten

-     Engineering, & Installation of Reverse Chain Grate Boiler kapasitas 50 ton/jam 
      type: SHL50 -2.5/300; Period: 2011 – 2012

      Client : PT. Tjiwi Kimia  – Mojokerto – Jatim
11
PT. VONEX INDONESIA

-     Replacement Chimney coal boiler #2; Period:  June 2010

-     Replacement Chimney coal boiler #1; Period:  July 2010

      Client : PT. VONEX INDONESIA  – Bandung  – Jabar
12
 PT. KAPURINDO SENTANA BAJA

-     Replacement  Screw Conveyor; Period:  July 2010

         Client : PT. KAPURINDO SENTANA BAJA  – Cilegon – Banten
13
PT. HEKSAGON TRIWIKRAMA

-      Supply 1 unit  mesin roll ACP, Type SX – 500; Period:  Desember 2012

          Client : PT. Heksagon Triwikrama
14
PT Tedco Agri Makmur (Lampung Tengah)

       Design Fabrication & Supply Thermal oil Tube periode :24 April 2013

       Client : PT Tedco Agri Makmur (Lampung Tengah)
15
 PT Trafoindo

       Supply 1 unit  mesin roll Plat, Type RP– 2012; Period:  Mei 2013

      Client : PT. Trafoindo ( Tangerang)
16
PT. PowerTech Indonesia

      Supply 20 unit  Air Damper, Client : PT. POSCO ( Cilegon - Banten)


17
CV. PURNAMA TIRTATEX

       Re-tube Furnace tube & Waterwall Tube Hamada Boiler type DF 12-13 FBC; 
       Period: Agustus 2013

       Client : CV. Purnama Tirtatex  – Bandung – Jawa Barat
18
PT BUANA HIJAU ADITAMA

        Fabrikasi 4 unit Storage Tank Cap 100 T, Period : September 2013

        Client : PT BUANA HIJAU ADITAMA - Tangerang
19
PT. MULYA MANDIRI SENTOSA

        Supply 1 unit  mesin roll Plat, Type RP– 2012; Period:  Oktober  2013

        Client : MULYA MANDIRI SENTOSA ( Tangerang)
20
PT. ARTHA RAKSA BAYA

        Supply 1 unit  mesin roll Plat, Type RP– 2012; Period:  Oktober  2013

        Client : MULYA MANDIRI SENTOSA ( Tangerang)
21
CV. PURNAMA TIRTATEX

        Replacement 2 unit  Boiler Chimney, Periode : November 2013

        Client : CV. Purnama Tirtatex – Bandung – Jawa Barat
22
PT.KALIABANG

        Piping Installation Biodiesel Plan cap 300 T/h; 
        Period : Desember 2013 -  Maret 2014 Client : PT DARMEX – Bekasi – Jawa Barat


23
PT.INAWAN CHEMTEX SUKSES ABADI

        Piping & Storage Tank Installation Chemical Plan; 
        Period : Agustus 2014 -  Februari 2015 Lokasi : Tigaraksa – Tangerang

24
PT. QINTANI

        Supply  8 Unit Storage Lube Tank Cap 25000 Liter ; 
        Period : April 2015 – Lokasi Papua Client : PT Freeport Indonesia
25
PT Tirta Freshindo Jaya (Mayora Group)

        Overhole Boiler & Perbaikan Furnace Refractory Boiler Hamada DF12  
        Period : 23 -  31 Juli 2014 Lokasi : Ciawi – Bogor


26
PT Tirta Freshindo Jaya (Mayora Group)

        Supply & Perbaikan controller boiler Hamada DF 12  
        Periode : 24 Oktober 2014  –– Ciawi – Bogor
27
PT Oriental Textile

        Retubing FBC Tube & Perbaikan Furnace Refractory Boiler Hamada DF12 
        Period : 1 -  10 Juli 2015  Bandung – Jawa Barat
28
PT Tirta Freshindo Jaya (Mayora Group)

         Overhole Boiler & Perbaikan Furnace Refractory Boiler Hamada DF12 & 
         Boiler Basuki TPH10   Period : 8 -  17 Juli 2015  – Lokasi  – Ciawi – Bogor
29
PT Nipindo Bangun Cipta

        Supply 2 unit  mesin roll Plat, Type RP– 2012 & Type 2020; Period:  September 2015
30
PT Berlian Palugada Perkasa

       Supply Grating Anak Tangga sebanyak 107 pcs dilapisi galvanize; 
       Period:  September 2015
31
PT Berlian Palugada Perkasa

        Supply Grating Anak Tangga sebanyak 58 pcs dilapisi galvanize 
        & Grating Platform ; Period:  Oktober 2015
32
PT  Nipindo Bangun Cipta

       Fabrikasi Bending Pipa 2.5” Sch 40 sebanyak 108 pcs; Period:  Nopember 2015
33
PT  Karsa Sumber Raharja

       Supply Screw Conveyor& Modifikasi chut Silo, Crushher Support ; 
       Period:  29 Desember 2015 s/d 02 Januari 2016 
       (Parung Panjang – Bogor – Jawa Barat)
34
PT  MASTRADA

       Supply & Installasi Daerator Tank, installasi Boiler 5 T/H & piping; 
       periode 2 November 2015 s/d 30 Desember 2015 
       Client : Bintan Lagoon Resort - Bintan Kep. Riau
35
PT  Nipindo Bangun Cipta

       Fabrikasi Bending Pipa 2.5” Sch 40 sebanyak 54 pcs; Period:  Januari 2016
36
PT  ATMI - Solo

      Supply 1 Unit Stainless Screw Conveyor Cap 2T/H panjang 4 Meter ; 
      Periode 22 Maret 2016 - 10 April 2016 ; Solo - Jawa tengah
37
PT  Rimba Partikel Indonesia

      Supply 2 Unit Heavy duty roller conveyor ' 
      Periode 2 April 2016 - 2 Mei 2016 ; Kendal - Jawa Tengah
38
PT  HUNG-A INDONESIA

      Supply & installasi Chimney Dia 1,5 m x 27 m ; 
      Periode 13 April 2016 - 7 Mei 2016 ; Cikarang - Jawa Barat
39
PT  ATMI - Solo

      Supply 1 Unit Mixing Screw Conveyor Cap 2T/H panjang 4 Meter ; 
      Periode 20 Mei 2016 - 17 Juni 2016 ; Solo - Jawa tengah
40
PT Tirta Freshindo Jaya (Mayora Group)

      Supply & Overhole  boiler Hamada DF 12  
      Periode : 1 Juni 2016 - 10 Juli 2016.  Ciawi – Bogor
41
PT Tirta Freshindo Jaya (Mayora Group)

      Supply & Overhole boiler Basuki cap 10 T/H  
      Periode : 1 Juni 2016 - 10 Juli 2016.  Ciawi – Bogor
42
PT DIAN SWASTIKA SENTOSA (IKPP - GROUP)

      Supply & Installasi Multicyclone for Boiler 25 T/H 
      periode :  11 Mei 2016 - Now. Serpong - Tangerang Selatan

SPESIFIKASI MESIN ROLL



GALERI INSTALASI TANGKI

TENTANG

Selamat Datang

Energi memiliki peran sangat penting dalam kehidupan manusia sejak zaman dahulu. Kayu bakar, batubara dan minyak bumi adalah jenis-jenis energi yang sangat popular. Hasil hutan berupa kayu bakar lambat laun di gantikan batubara. Kemudian berlanjut dengan pemakaian minyak bumi setelah itu dimulai pemakaian gas bumi. Rotasi pemakaian sumber energi tersebut kemudian berbalik lagi setelah adanya krisis minyak tahun 1973. Maka usaha pengembangan batubara sebagai sumber alternative terhadap minyak bumi dimulai lagi untuk mengurangi ketergantungan terhadap minyak bumi.

Berangkat dari keyakinan dan pengalaman dalam bidang Pengembangan dan Pemberdayaan sumber daya alam dan energi untuk meningkatkan kesejahteraan dan turut berpartisipasi dalam pembangunan masyarakat, nusa dan bangsa, kami berkomitmen untuk mengabdikan segala dedikasi, semangat, tenaga, propesionalitas dan intelegensi demi terciptanya sebuah tatanan kehidupan yang mengacu pada efisiensi pemanfaatan sumber daya alam dan energi.

Beberapa Profesional yang telah berpengalaman dalam bidang pemanfaatan sumber daya alam alternative  dengan menyatukan visi dan misi dalam pemanfaatan sumber daya alam tersebut maka terbentuklah suatu wadah sebagai badan usaha yang bernama  CV. PANCA WAHANA ENGINEERING, yang didirikan pada tahun 2002 di TANGERANG

Berbekal pada hal tersebut CV. PANCA WAHANA ENGINEERING berkeyakinan bahwa masih banyak hal yang harus dilakukan demi tercapinya misi dan visi. Kami sadar sepenuhnya bahwa dalam usia yang relatif dini belum banyak proyek yang kami tangani, tapi dengan keyakinan dan propesionalitas yang kami dedikasikan, kami akan mampu memberikan yang terbaik demi tercapainya kepuasan, ketepatan waktu dan standard mutu yang diinginkan pengguna jasa.

CV. PANCA WAHANA ENGINEERING  adalah perusahaan yang bergerak di bidang kontraktor Mekanikal yang bertitik berat pada fabrikasi dan instalasi .
Menjadikan perusahaan konstruksi yang berkembang dan mampu bersaing dengan sehat. Mampu memproduksi mesin dan  memberikan pelayanan dan service yang memuaskan bagi pelanggan.

Pada tahap awal pendirian ini CV. PANCA WAHANA ENGINEERING  mendedikasikan segenap daya dan upaya untuk memecahkan segala permasalah yang berkaitan dengan apa yang telah kami miliki selama ini. Terutama yang berkaitan dengan:

Instalasi :
  •  Boiler
  • Incinerator
  • Gasifier
  • Asphalt Mixing Plant
  • Thermal Oil dan Hot Water boiler
  • Pekerjaan Brick Laying
  • Electrical & Control
  • Piping & insulasi

Fabrikasi :
  • Mesin Roll Plat
  • Cerobong
  • Ducting
  • Storage tank
  • Material handling
  • Ash handling
  • Konstruksi bangunan
  • dll

Service :
  • Design, Engineering dan Konsultan
  • Maintenance & overhaul
  • Modifikasi Boiler
  • Pengadaan spare part

CONTACT PERSON

JAKARTA AREA:
Rahmat Heriyanto
Nomer Telpon: 0888 1041 524
Nomer HP: 0813 1983 7530
WhatsApp No: 0813 1983 7530


Jamil
Nomer Telpon: 082299279989
Nomer HP: 0819 0864 7190
WhatsApp No: 0819 0864 7190



CV.PANCAWAHANA ENGINEERING
Alamat: Jl. Pendidikan Gg. Kakaktua no.25, RT 2 / RW 11, kel. Rawa kalong, kec. Gn Sindur - Bogor 16340, Jawa Barat Indonesia
Nomer Faks/Tlp: (0251) 8615 832
Email : pancawahanaengineering@gmail.com








PT. PANCAWAHANA TEKNINDO
OFFICE : RUKO BUKIT DAGO BLOK AA6 NO 16 
                Jl. Pendidikan kel. Rawa kalong, kec. Gn Sindur - Bogor 16340
Email   :  patend@panca-wahana.com

SURABAYA AREA:
Office  : Perumahan permata sukodono raya blok c2 no 25 - Sidoarjo - Jawa Timur 61258

CONTACT PERSON

HARI MUSTAJIB
Tlp : 081335769572, 081230131622

WhatsApp No: 085311803039
Email : mustajib_hari@yahoo.com, 
            hari.mustajib@gmail.com
            hari.mustajib@panca-wahana.com




 
Support : Pancawahana | Your Link | Your Link
Copyright © 2013. TEST - All Rights Reserved
Template Created by Creating Website Published by Mas Template
Proudly powered by Blogger